This week we continued our replacement of the awning in Seagoville. The awning was damaged by wind, snow and hail. We demolished the old awning (see previous blog posts) and reframed the new awning with steel members. We welded and bolted the awning structure. In places where the structure framing has been completed we have begun to install the 24 gauge structural steel panel roof system. We will continue to frame and install the roof with an eye on finishing in a couple of weeks.