POSTED PROJECTS

9/15/2010

Hunting Cabin and Deer Blind Construction

This week we built a deer blind – hunting cabin combination.  Once the footings had been set we laid the heavy duty, pre engineered floor joists and decked the sub floor.  We then framed the tilt walls and set the pre engineered roof trusses.  We then tied the roof trusses and installed the lathe for the metal roof.  We installed the front porch timbers, deck planks, windows & doors.  The metal wall panels were then installed and all of the windows & doors were flashed.  Upon completion of the walls & fascia the roof panels were laid to bring the project to a finish.