POSTED PROJECTS

7/13/2010

Residential Construction/Patio


This week we poured, stamped and stained the new concrete patio.  We had to remove the wrought iron rail which will be refurbished and painted and welded back into place.  We tied steel throughout the new patio area after having removed the old tile and cutting beam channels.  We also had our mason wrap the posts of the balcony that we built above the garage last year.  We were able to locate matching bricks and now the balcony posts match the patio posts.  Now that the patio is poured and finished the replacement of the wrought iron rails is the last phase.